Application form for Small Wind Energy Systems
(Water Pump & Aero generators)
|
1. |
Applicant/Institution Name
|
: |
|
|
2.
|
Full Address |
: |
|
|
3. |
Does the applicant belong to SC/ST?
|
|
|
|
4. |
Where
is the water pumping windmill
to be installed? (Extent of land survey No. and details of place should be furnished) (Photo
copy of the document to prove the ownership of the land should also be
enclosed) |
|
|
|
5. |
Purpose for which the windmill has to be installed ?
|
|
|
|
6. |
Is there good wind speed during the major period of year?
|
|
|
|
7. |
a. Details of availability of water
resource
(for water pumping)
Dugwell Borewell Diameter of the well Borewell diameter and its depth and its depth
b. Tank/River-Details of Availability of water
|
|
|
|
c. Depth of water level from ground level
|
|
||
|
8. |
Details of electric loads required to be fed (for small aerogenerators) Type of Load Number Total Watts No. of hours to be used (a) Lights (b) Fans (c) Any other equipment
|
||
|
9.. |
Is there any obstruction in and around the place where the windmill has to be
installed?
|
|
|
|
10. |
a.
Will you take full responsibility after the installation of
windmill?
|
|
|
|
11. |
Do you agree to depute any of your representatives toTEDA for training on the operation and maintenance of the Windmill?
|
|
|
|
12. |
Will you accept to insure the wind mill ? |
Yes/No |
|
|
13. |
a.
Do you agree to bear the balance cost of the windmill after subsidy?
|
|
|
|
14. |
You have to bear the expenditure on civil foundation. Iron bridge to hold the
Iron pillars of the windmill, additional pipelines, additional pump rods etc.
We
agree to pay the DD in favour of TEDA and also
agree to complete the work.
|
|
|
|
15. |
On receipt of the application, it will be sent to the MNRE for sanction. If it is not sanctioned by the MNRE, the caution deposit amount will be refunded. After receipt of the final allotment order the windmill has to be installed by the beneficiary immediately.
If not the caution deposit
amount will not be refunded.
After
installation of the windmill the caution deposit amount will be directly
released to the supplier who collects his charges from beneficiary after
deducting subsidy and caution deposit. Will you agree to this? |
Yes/No |
|
|
16. |
If necessary, will you construct storage tank at your cost? |
Yes/No |
|
For
Office Use
|
Date of Inspection
|
|
Is the place suitable for installation of windmill?
Yes/No
|
|
If yes, have you received DD from the applicant?
Yes/No
|
|
If not, reasons
: |